

4 Hardman Square
Manchester
CubicWorks delivered the comprehensive transformation of 4 Hardman Square – an 80,000 sq ft office block in the heart of Manchester’s prestigious Spinningfields business district. Working in partnership with Quartz, this complex project involved significant structural modifications, advanced building systems, and sustainable design integration. The refurbishment elevated the Norman Foster-designed building to modern Grade A standards while achieving BREEAM Excellent certification and meeting the most demanding contemporary workplace requirements.
Location
Manchester
Client
Quarts Project Services, St James Place PLC, Orchard Street
Size
60,000
Duration
12 months
Major Structural Enhancements:
External cladding works transforming the building’s facade and performance
New mezzanine levels to reception maximizing spatial efficiency and creating impressive arrival areas
Four new lifts enhancing vertical transportation throughout the 80,000 sq ft building
Significant builders works throughout all floors upgrading structural elements
New incoming electrical supply supporting enhanced building performance
Advanced Building Systems:
Complete VRF AC system installation providing zoned climate control throughout
RAF flooring installation across all floor plates ensuring premium finish quality
High quality architectural mesh ceiling throughout floor plates creating sophisticated workspace environment
Intumescent painting to beams and columns ensuring comprehensive fire protection compliance
All new common parts including toilets establishing contemporary workplace standards


Achieving Excellence Across Every Standard
4 Hardman Square demanded more than typical refurbishment – it required transformation to the highest sustainability and performance standards. Most contractors avoid projects with such comprehensive certification requirements. We embraced them as our benchmark.
Our integrated approach achieved exceptional standards:
BREEAM Excellent certification – demonstrating outstanding environmental performance
Nabers rating compliance – meeting Australian energy efficiency standards adopted in UK
Wired Score achievement – ensuring cutting-edge digital connectivity
Considerate Constructors certification – maintaining highest construction standards throughout
The CubicWorks Difference
Partnership Excellence: Working alongside Quartz, we demonstrated our collaborative approach to complex projects. When multiple specialisms are required, our partnership model ensures seamless delivery without compromising on quality or timelines.
Sustainability Leadership: Achieving BREEAM Excellent alongside Nabers and Wired Score certifications required detailed coordination across all building systems. Our team’s expertise in sustainable construction delivered environmental performance that few contractors can match.
Spinningfields Standards: Located in Manchester’s premier business district, 4 Hardman Square required finishes and systems that meet the expectations of the city’s most discerning occupiers. Our work elevated the building to compete with the very best Spinningfields has to offer.









4 Hardman Square now stands as a flagship example of sustainable Grade A office space in Manchester’s most prestigious business district. The building’s transformation demonstrates how comprehensive refurbishment can elevate existing assets to exceed new build standards.
Located at the heart of Spinningfields, the building benefits from proximity to Manchester’s finest restaurants, hotels, and transport links while offering workspace that meets the highest environmental and technological standards.
Most importantly? Our partnership approach with Quartz proved that when specialist expertise combines with integrated delivery, even the most demanding projects can achieve exceptional results across every performance metric.
When Grade A standards meet sustainability excellence in Manchester’s premier business district, only proven partnerships deliver. 4 Hardman Square demonstrates that 40+ years of expertise, combined with collaborative excellence, creates workspace that sets new benchmarks for performance and environmental responsibility.
CubicWorks


