Hilti
Manchester

PROJECT OVERVIEW

Award-Winning Excellence Through Full Design Accountability

CubicWorks delivered the comprehensive CAT B fit-out of Hilti’s 42,000 sq ft UK headquarters at No.1 Circle Square – the flagship building in Manchester’s Innovation District. This award-winning project relocated Hilti’s 200-strong team from Trafford Park to floors 2, 3, and 4 of Bruntwood SciTech and Vita Group’s pioneering development. Working alongside CBRE and tp bennett architects, we created a ‘best in class’ regional headquarters featuring the highest quality finishes that earned a North Design Award and nominations for Mixology and BCO Awards.

Location

Manchester

Client

CBRE

Size

42,000

Duration

6 months

WHAT WE DELIVERED

Award-Winning CAT B Transformation:
42,000 sq ft premium CAT B fit-out with best-in-class quality finishes across three floors
Full M&E design responsibility – engineering all building services from concept to completion
Open-plan collaborative workspace with flexible touchdown spaces and integrated meeting areas
Specialist workplace zones including phone booths, larger meeting rooms, client kitchen and lounge areas
Complex acoustic baffle coordination with advanced clash detection resolution between services and ceiling systems

Technical Excellence & Awards:
North Design Award winner – recognition for outstanding design and delivery quality
BCO and Mixology Award nominations – industry acknowledgment of workspace excellence
Living wall installation featuring premium biophilic design elements in the entrance area
Future-ready infrastructure enabling Hilti to attract and retain international talent
Seamless building integration within Circle Square’s flagship commercial development

THE CHALLENGE

Award-Winning Quality in Complex Conditions

Hilti’s headquarters demanded more than exceptional design – it required navigating significant logistical and technical challenges while delivering award-winning quality. Most contractors struggle with the coordination complexity of occupied buildings and advanced building systems. We turned these challenges into opportunities for excellence.

Our integrated approach solved multiple complex challenges:
Full M&E design responsibility – engineering all building services from concept through to completion
Acoustic baffle coordination – resolving clash detection challenges between ceiling systems and M&E services
Shared building logistics – managing access and egress routes with adjoining occupiers and other contractors
Award-winning finish quality – achieving North Design Award standards while meeting demanding timelines
Communication excellence – coordinating multiple stakeholders to ensure seamless project delivery

The CubicWorks Difference

Full Design Responsibility: Taking complete M&E design accountability from concept to completion demonstrates our integrated capabilities that most contractors can’t match. When others subcontract design responsibility, we engineer solutions in-house.

Technical Problem-Solving: Our team’s expertise in clash detection and acoustic coordination meant we could resolve complex ceiling and services integration challenges that would defeat less experienced contractors.
Communication Excellence: Managing shared access routes with adjoining occupiers and multiple contractors required the communication skills we’ve perfected through 40+ years of complex project delivery. Our approach turned potential conflicts into collaborative success.
Award-Winning Standards: Achieving North Design Award recognition while managing technical complexity proves that when you combine engineering expertise with genuine project care, exceptional results follow.

THE RESULT

Hilti UK Headquarters now stands as an award-winning example of how full design responsibility and communication excellence deliver exceptional results. The North Design Award recognition, combined with BCO and Mixology Award nominations, proves that our integrated approach creates workspace that sets industry standards.
Located within Circle Square’s £850m development and overlooking Symphony Park, the headquarters positions Hilti at the heart of Manchester’s tech ecosystem while demonstrating what’s possible when contractors take complete accountability for both design and delivery.
Most importantly? Our ability to manage complex logistics while delivering award-winning quality established new benchmarks for occupied building fit-outs, proving that when you engineer solutions others can’t attempt, recognition follows.

When global technology leaders demand award-winning quality with full design accountability, they choose partners who engineer complete solutions. Hilti UK Headquarters demonstrates that 40+ years of expertise, combined with genuine communication excellence, creates workspace that wins industry recognition while setting new standards for technical integration and project delivery.
CubicWorks